Solid wood flooring installation
1. Spread some special classes can be moisture on the ground floor, insect powder.
2. Laying a layer of moisture-proof pad on the keel, floor mats joints is best to use adhesive tape.
3. Overall test shop: the deployment of the floor color. Can be a consistent pattern tone on the living room floor, aisle or at the obvious, the slightly different on the corner or under furniture, in order to coordinate the overall appearance.
4. When laying the floor, set aside more than 8mm expansion joint between the floor and the wall.
5. Prohibit any glue between the floor and painted plywood. According to local conditions remain appropriate floor expansion joint between the floor and: Usually 0.2-0.6mm. In the dry northwest, north and northeast regions, between the floor generally compact nature better.
6. When laying floors need nailing with floor dedicated nail into the oblique, you can not use steam nails.
Solid wood flooring installation and construction requirements and fixed frame:
1. We must first make the construction moisture, pest control treatment, the first insect sprinkle powder, holes and moisture-proof paper (film). Moisture-proof paper (film) stacked to each other more than 20cm, and shall be spread to the foot of a wall more than 10cm.
2. When using the method of laying the keel, keel and accessories must be dried, not low quality, pollution, humidity, perishable, easy to moth-eaten materials for the keel and accessories, otherwise not construction.
3. First ground leveling (ground height difference is too large, should skids leveling), we used between the keel and keel Nailing hammer drill or Method wooden keel fixed to the ground.
4. Keel and the wall or other materials are to leave the pitch 5-10mm.
5. If the ground water or heating facilities, take keel laying, the keel should be replaced by steel, aluminum and other new keel or adhesive bonding short wooden keel.
6. After laying the keel should be firm and flatness inspection, if uneven or weak, can not lay the floor.
Solid wood flooring installation and acceptance:
Acceptance time: within three days after the end of the floor installation and acceptance.
Basic requirements: floor laying width direction length ≥6m, lay length or floor length direction ≥10m, it must take reasonable steps spaced adjacent floor joints should remain transition with trim.
Entrance floor should be cut off, leaving expansion joints, transition with trim.